Jencor Construction

ADU Builder in Venice, CA

ADU design and build in Venice. We built a two-story ADU here with a custom kitchenette, an oak stair with built-in storage, a tiled bathroom and an upstairs loft with a Juliet balcony.

Venice, CAZIP 90291CSLB #968170Fully insured

Kitchenette with white slab upper cabinets, round oak pulls, a slatted white oak hood, glossy tile backsplash, induction cooktop and panel-ready oak base cabinets, Venice

Our Venice ADU: Harding

This two-story ADU makes a small Venice lot work hard:

  • Kitchenette: white slab upper cabinets with round oak pulls, a slatted white oak range hood, a glossy handmade-look tile backsplash, an induction cooktop, a microwave drawer, a beverage refrigerator and panel-ready oak base cabinets
  • Stair: oak treads and risers with a black horizontal bar rail and oak handrail, with flush white storage cabinets built into the space underneath
  • Oak wall: a full-height white oak panel wall with concealed doors
  • Bathroom: green and white vertical tile, a frameless glass shower with a niche and rain head, a floating oak vanity and a marble-look floor
  • Upstairs: a loft with wide-plank oak floors and a sliding door to a Juliet balcony, plus an office wall of built-ins: a sit-stand oak desk set into oak side panels, a full-height oak bookcase, white corner cabinets over open shelves, and a white drawer dresser with an oak top
  • Outside: a smooth stucco shell, barn-style lights and folding French doors that open the ground floor to the garden

How long an ADU takes

From design through the final inspection, an ADU usually takes about 10 to 12 months. Most of that time goes to design, plan check and utilities; construction is the shorter part.

Permits in Venice

Venice is part of the City of Los Angeles, so ADU plans go through LADBS plan check. Venice is also in the California Coastal Zone, and many projects there need coastal review on top of the building permit. We sort out which approvals apply before design is final.

See the full projects

More about our adu design & build · Everything we do in Venice

Photos of our work

Every photo is a finished Jencor project. Tap a photo to enlarge it.

ADU Builder in Venice: questions

Have you built ADUs in Venice?

Yes. We built a two-story ADU in Venice with a kitchenette, a tiled bathroom, an upstairs loft and built-in storage under the stair.

Does a Venice ADU need coastal approval?

Often, yes. Venice is in the Coastal Zone, so many projects need coastal review in addition to LADBS plan check. We check what applies to your lot early.

How long does an ADU take?

Usually about 10 to 12 months from design to final inspection.

Tell Corey about your project

Call or send a short note about the property and what you want to build. Corey will call you back to set up a consultation.

Call Text Book a visit
Text Corey(310) 770-7707