Jencor Construction

ADU Builder in Sherman Oaks, CA

ADU design and build in Sherman Oaks. We have built two ADUs here: a detached unit with a vaulted kitchen at Vista Del Monte, and a two-story ADU over a new garage on Stansbury.

Sherman Oaks, CAZIP 91403, 91423CSLB #968170Fully insured

Detached ADU with French doors and a sand-finish stucco exterior, set behind a lawn and paver patio, Sherman Oaks

Our Sherman Oaks ADU: Vista Del Monte

This is a new, detached, permitted ADU behind the main house:

  • Kitchen and living space: a vaulted ceiling with a skylight, white flat-panel cabinets to the ceiling, a blue and white patterned tile backsplash, a gas range, microwave, dishwasher and side-by-side refrigerator
  • Bathroom: a white shaker vanity with a quartz top, an ornate gold mirror, a glass shower in white tile, and a black and white star tile floor
  • Throughout: wide-plank oak floors, recessed lighting, a ductless mini-split, double closets, and French doors on two sides opening to the yard
  • Exterior: a sand-finish stucco shell with a gable roof, set behind the lawn and paver patio

How long an ADU takes

From design through the final inspection, an ADU usually takes about 10 to 12 months. Most of that time goes to design, plan check and utilities; construction is the shorter part.

Our second Sherman Oaks ADU: Stansbury

On Stansbury we built a two-story ADU over a new two-car garage off the alley:

  • Kitchen: light oak flat-panel cabinets, black quartz counters and full-height backsplash, stainless refrigerator and microwave, and a peninsula with seating
  • Bedroom: a white barn door on a steel track, a navy accent wall and a ceiling fan
  • Bathroom: a navy vanity with a marble-look top, a frameless glass shower and brushed nickel fixtures
  • Den: green walls with a walnut hidden bookcase door, a matching walnut door and a walnut wet bar
  • Laundry hall: stacked washer and dryer, built-in oak cabinets and mirrored closet doors
  • Outside: stucco and lap siding, herringbone pavers, artificial turf, raised beds and new planting

Permits in Sherman Oaks

Sherman Oaks is part of the City of Los Angeles, so ADU plans go through LADBS plan check, and new service is coordinated with LADWP and SoCalGas. Sherman Oaks is also close to our Tarzana base, which makes inspection days easy to cover.

See the full projects

More about our adu design & build · Everything we do in Sherman Oaks

Photos of our work

Every photo is a finished Jencor project. Tap a photo to enlarge it.

ADU Builder in Sherman Oaks: questions

Have you built ADUs in Sherman Oaks?

Yes. We built the Vista Del Monte detached ADU in Sherman Oaks, with a full kitchen, a bathroom and French doors to the yard.

Can a detached ADU have a full-size kitchen?

Yes. Vista Del Monte has a full kitchen with a range, dishwasher and full-size refrigerator.

How long does an ADU take?

Usually about 10 to 12 months from design to final inspection.

Tell Corey about your project

Call or send a short note about the property and what you want to build. Corey will call you back to set up a consultation.

Call Text Book a visit
Text Corey(310) 770-7707