An ADU feasibility review asks whether a useful dwelling can fit the property, reach approval, connect to required systems, and support the owner's intended use. It should happen before a detailed floor plan or construction price is treated as reliable.
Define the intended use
Record who the unit is for, how long it is expected to serve that purpose, required accessibility, privacy, parking and access needs, storage, and the relationship to the primary home. Do not begin with a standard plan that may not fit the use or the lot.
Assemble the property record
Collect the property address, survey or site plan if available, existing plans, permit history, photographs, utility information, title or association information, and any known geotechnical, drainage, or structural reports.
For a City of Los Angeles property, review ZIMAS for parcel-specific zoning, overlays, planning cases, and linked permit history. Confirm current requirements with the responsible departments.
Compare plausible configurations
Evaluate conversion, attached, and detached options that are physically plausible. The feasibility result may eliminate options. That is useful work.
- Existing structures and legal history.
- Setbacks and objective development standards.
- Access and construction staging.
- Water, sewer, power, gas, and mechanical needs.
- Grade, drainage, trees, and other site constraints.
- Privacy and circulation.
- Required design, engineering, energy, and permit work.
- Long-term effect on the primary home and yard.
Use the current review framework carefully
California HCD's March 2026 ADU Handbook says a permitting agency must provide a written completeness determination no later than 15 business days after receiving an ADU or JADU application. If an existing single-family or multifamily dwelling is on the lot, the agency generally must approve or deny a completed application within 60 days.
The handbook also explains that state ADU law applies in the coastal zone while Coastal Act protections continue to apply. Coastal processing depends on the applicable local coastal framework and the property.
These agency review periods are not a complete design or construction schedule. They should not be read as a promised project duration.
Identify technical owners
The feasibility memo should name who is responsible for survey, architecture, structural work, geotechnical review where applicable, civil or drainage work, energy documentation, utility coordination, and permit preparation.
If a topic is not yet assigned, mark it open. Do not let an unowned technical question become a construction assumption.
Produce a bounded feasibility return
The return should document the intended use, records reviewed, plausible configurations, identified controls, site and utility questions, required specialists, exclusions, assumptions, decisions, and dated sources. It should not promise final approval, cost, or duration.
Decide whether to proceed
Proceed to design when at least one configuration remains plausible, the responsible parties are identified, and the owner understands the open questions. If the property record or site conditions are incomplete, commission the next investigation instead of forcing a design decision.
Related Jencor services and articles
Move between the detailed planning guidance and the Jencor service that can help carry the project forward.
- ADU Design & Build service
- ADU costs, resale value and long-term use
- How to choose an ADU builder
- Remodel, add on, or build new
Sources
- California HCD, Accessory Dwelling Unit Handbook, March 2026
- Los Angeles City Planning, ZIMAS
- Los Angeles Department of Building and Safety
Questions
What should an ADU feasibility review answer?
It should identify plausible configurations, property controls, site and utility questions, required specialists, open assumptions, and the decisions needed before design advances.
Does feasibility guarantee ADU approval?
No. Feasibility is a bounded early review. Final approval depends on complete documents, current requirements, agency review, and property-specific conditions.
When should ADU design begin?
Advance design after at least one configuration remains plausible, responsible technical parties are identified, and the owner understands the unresolved property and approval questions.